Starting the week off on a rather cold note, we are in the process of wrapping up a drainage project that we started last week.
Although the new parking lot project was a huge success, for the last two seasons we have been battling a wet area where surface drainage flows onto the course from the parking lot. This week we will be installing catch basins, as well as french drains, in order to dry out the area east of the #1 forward tee.
Unfortunately, the nearest exit point for the water is a catch basin 300' away on the left side of #18. Connecting in at this point gets us back to a main drainage line.
This project is the first of several drainage projects scheduled for the winter months.